Sign In
Forgot Password?
Sign In | | Create Account

L-3 Link Simulation & Training Cuts Engineering Change Orders by Ninety Percent Using Capital Software from Mentor Graphics

WILSONVILLE, Ore., May 21, 2013—Mentor Graphics Corp. (NASDAQ: MENT) today reported that L-3 Link Simulation & Training’s (L-3 Link) operation in the United Kingdom has cut the number of electrical engineering change orders (ECOs) at production by 90 percent using Capital® software. The improvement is largely attributed to the Capital tool’s detailed component modeling functionality, extensive checking automation, and database stability, among other tool capabilities. Together, these help ensure design data arriving at production is of the highest quality.

L-3 Link designs and builds flight simulators, supplying multiple customers worldwide. The high level of complexity of modern simulators severely strains design processes and the software used to support them.

L-3 Link

“The reduction of ECOs is particularly impressive, because the first machine L-3 designed using the Capital tool simulated the highly sophisticated Boeing 777 aircraft,” said Martin O’Brien, general manager of the Integrated Electrical Systems Division of Mentor Graphics. “The benefits that L-3 Link has gained in terms of reduced cost and schedule delay really show the power of this toolset in aerospace and related industries.”

(Mentor Graphics, Mentor and Capital are registered trademarks of Mentor Graphics Corporation. All other company or product names are the registered trademarks or trademarks of their respective owners.)

For more information

James Price
james_price@mentor.com
Mentor Graphics
503.685.1778

Suzanne Graham
suzanne_graham@mentor.com
Mentor Graphics
503.685.7789

About Mentor Graphics

Mentor Graphics Corporation is a world leader in electronic hardware and software design solutions, providing products, consulting services and award-winning support for the worlds most successful electronic, semiconductor and systems companies. Established in 1981, the company reported revenues in the last fiscal year in excess of $1.15 billion. Corporate headquarters are located at 8005 S.W. Boeckman Road, Wilsonville, Oregon 97070-7777.

 
Online Chat