PCB Manufacturing, Assembly & Test Blog

Posts tagged with 'AVL'

101 ways to use the Valor Parts Library (VPL)

Posted Mar 17, 2011, by Mark Laing

Okay, well maybe that is a little bit of an exaggeration but there are still many ways to leverage the manufacturer specific package data from the VPL throughout the Process Engineering flow. As a follow up to my last posting I mentioned that I would be talking about the creation and use of manufacturer specific packages. Through the use of the VPL, manufacturer specific packages can be downloaded … Read More

Tags: packages, AVL, approved vendor list, bill of materials, VPL, BOM

Components, Bill Of Materials and Approved Vendor Lists

Posted Feb 28, 2011, by Mark Laing

In today’s typical electronic assemblies the single largest cost is the components that make up the assembly. Therefore being able to manage the component supply chain is critical to delivering profitable products for electronic manufacturers. Within the Process Engineering product line of the Valor MSS suite, vPlan provides an unparalleled solution for managing components, Bill of Materials (BOM) … Read More

Tags: AVL, approved vendor list, bill of materials, BOM