The Complete Material Verification Solution
On-demand Web Seminar
There are currently no dates scheduled for this event. However a recording of a previous session is available as an on-demand web seminar.
View This On-Demand Web Seminar NowOverview
Materials are the single largest contribution to cost in a PCB Assembly operation. A single mistake can be extremely costly and disruptive to the operation and bottom line. Without true and complete material verification, the operation is playing “Russian Roulette” with quality, performance, delivery and scrap. This webinar explains the key elements of verification which provide conformance and compliance bringing significant business advantages and opportunities as a result.
If not done correctly, verification can be costly and provide a false sense of security, so it is vital to understand how to do it correctly and cost effectively to ensure compliance and open up the potential of significant business opportunity.
What You Will Learn
- The elements and methods of complete material verification
- The costs of verification errors
- The risks of incomplete solutions
- The costs of verification errors
- The direct and unseen benefits of material verification
- Follow-on opportunities that material verification enables
About the Presenter
Bruce A. Isbell
Sr. Strategic Marketing Manager, Valor LTD.
Mr. Isbell has worked “hands on” in the electronics manufacturing industry for 30 years. His experience on the shop floor as a process engineer spans across low volume complex boards for the military at Texas Instruments, to very high volume boards for telecommunications at Motorola. For the past 12 years Mr. Isbell has utilized his manufacturing experience to refocus his career to help others achieve high productivity by providing software solutions to electronics manufacturers. Mr. Isbell joined Valor in 2000 and is now the Sr. Strategic Marketing Manager on the corporate marketing team.
Who Should Attend
- Managers & Directors of Manufacturing
- Managers & Directors of Planning
- Managers & Directors of Materials
- Managers & Directors of Engineering
- Anyone involved with PCB Assembly
Products Covered
Technical Requirements
What do I need to watch and hear this web seminar?
Mentor Graphics’ web seminars are delivered using Adobe Connect. You will be able to login to the seminar room 15 minutes prior to the start time on the day of the presentation. You can hear the audio using your computer’s speakers via VoIP (Voice over IP) and background music will play prior to the beginning of the presentation.
Detailed system requirements
Microsoft® Windows
- Windows XP, Windows Vista, Windows 7, Windows 8
- Microsoft Internet Explorer 7, 8, 9, 10; Mozilla Firefox; Google Chrome
- Adobe® Flash® Player 10.3 or later
- 1.4GHz Intel® Pentium® 4 or faster processor and 512MB of RAM
Mac OS X, 10.5, 10.6, 10.7.4, 10.8
- Mozilla Firefox; Apple Safari; Google Chrome
- Adobe Flash Player 10.3
- 1.83GHz Intel Core™ Duo or faster processor and 512MB of RAM
Linux
- Ubuntu 10.04, 11.04; Red Hat Enterprise Linux 6; OpenSuSE 11.3
- Mozilla Firefox
- Adobe Flash Player 10.3
Mobile
- Apple supported devices: iPad, iPad2, iPad3; iPhone 4 and 4 S, iPod touch (3rd generation minimum recommended)
- Apple supported OS versions summary: iOS 4.3.x, 5.x, or 6.x (5.x or higher recommended)
- Android supported devices: Samsung Galaxy Tab 2 (10.1), Samsung Galaxy Tab (10.1), ASUS Transformer, Samsung Galaxy Tab (7”) , Motorola Xoom, Motorola Xoom 2, Nexus 7
- Android supported OS versions summary: 2.2 and higher
- Android AIR Runtime required: 3.2 or higher
Additional requirements
- Bandwidth: 512Kbps for participants, meeting attendees, and end users of Adobe Connect applications. Connection: DSL/cable (wired connection recommended) for Adobe Connect presenters, administrators, trainers, and event and meeting hosts.
Related Resources
The Power Of Work-Orders
On-demand Web Seminar 43:27The Power Of Work-Orders
During this webinar we will show you how Work-Orders provide the opportunity to manage world-class MES systems linking together all aspects of the PCB-A...
TAGS: PCB assembly, SMT data preparation, SMT factory planning, SMT optimization, Valor MSS Material Management, Valor MSS Business Intelligence
Reduce inventory and improve delivery with streamlined...
Product Demo 03:24Reduce inventory and improve delivery with streamlined material flow to production
See how Valor MSS Material Management guides the material handler to pull the right material Just-In-Time, before exhaust points or bottle necks occur on the line. Correct material flow means that buffer...
TAGS: traceability requirements, Valor MSS Material Management
Cracking the 'WIP Effect' for Maximum Material Performance
White PaperCracking the 'WIP Effect' for Maximum Material Performance
The number one cause of down-time on SMT lines is related to material, as either a shortage or a logistical misstep that fails to place the right quantity of the right material at the right location at...
TAGS: Valor MSS Material Management

