Cracking the 'WIP Effect' for Maximum Material Performance
White Paper
ABSTRACT
The number one cause of down-time on SMT lines is related to material, as either a shortage or a logistical misstep that fails to place the right quantity of the right material at the right location at the right time. From a business perspective, the downtime caused by material problems is often the largest unplanned cost in the manufacturing operation. This paper will review many factors that contribute to the fundamental issue behind the chaos of material related downtime: inventory inaccuracy, and the steps needed to resolve this crucial problem.
Related Resources
The Power Of Work-OrdersOn-demand Web Seminar 43:27The Power Of Work-OrdersDuring this webinar we will show you how Work-Orders provide the opportunity to manage world-class MES systems linking together all aspects of the PCB-A... TAGS: PCB assembly, PCB Manufacturing, SMT data preparation, SMT factory planning, SMT optimization, Valor MSS Material Management, Valor MSS Business Intelligence |
Reduce inventory and improve delivery with streamlined...Product Demo 03:24Reduce inventory and improve delivery with streamlined material flow to productionSee how Valor MSS Material Management guides the material handler to pull the right material Just-In-Time, before exhaust points or bottle necks occur on the line. Correct material flow means that buffer... TAGS: traceability requirements, Valor MSS Material Management |
Improve Materials Management with Intelligent JIT...On-demand Web Seminar 31:03Improve Materials Management with Intelligent JIT material flow for SMT linesThis webinar will provide you with an understanding of different needs and perspectives of material management, to recognize the bad habits, learn how JIT can address these needs and see the real benefits... TAGS: Valor MSS Material Management |