Avoid FPGA Project Delays by Adopting Advanced Design Methodologies
White Paper
ABSTRACT
Over 40% of FPGA design projects fall behind schedule. In order to reduce the risk of delay in product delivery, changes need to be made not just in verification but also in the design process itself. Design simplification must be a principle that starts at the beginning of the project life cycle – before verification of complex code has become the bottleneck that delays project delivery. This paper examines two concepts here that can simplify the implementation of a complex FPGA design: the use of SystemVerilog and vendor-independent modeling.
Related Resources
Explore the True Potential of Your FPGA Design
On-demand Web Seminar 19:27Explore the True Potential of Your FPGA Design
In this seminar, you’ll discover how to leverage FPGA Precision Synthesis technology to find the true potential of your design.
Introducing Precision RTL Plus + LeonardoSpectrum
Technology Overview 01:01Introducing Precision RTL Plus + LeonardoSpectrum
Precision RTL Plus + LeonardoSpectrum provides a safe transition to state of the art synthesis Precision RTL Plus while preserving backward compatibility for legacy projects.
FPGA Synthesis for High Assurance Design (Including...
White PaperFPGA Synthesis for High Assurance Design (Including DO-254).
Updated for 2011, this paper provides background information and also goes into detail on FPGA synthesis challenges and solutions in high assurance design, including DO-254 environments.

