Sign In
Forgot Password?
Sign In | | Create Account

How many frogs does a horse have?

The internet is big. It’s not sentient yet, though Robert Swayer has written a compelling story of how it might ‘Wake‘. In fact it’s far from intelligent at all. Banal comments about “how we ever managed without it” will age so quickly that future historians will assume a typo, more intelligence than we currently have and take the phrase to have been “how did we ever manage with it”.

It looks like the internet search wars are hotting up with the launch of Bing by Microsoft, maybe the first serious competition to Google. Their ad campaign in the UK was competitively pointed to say the least. Information does not assure understanding which in turn puts intelligence one step further removed.

I had some fun with a search engine recently with it’s search suggestions it recommends as you type:

frogs_search

I can’t imagine that many people have searched for the highlighted string, maybe a developer has had some fun instead. Either way it made me laugh and has further assured my use of this particular engine.

The power of the internet to provide such capability so many users (~500million daily regulars apparently) is, despite its failings, immense. From an engineering perspective power is measured in Watts. Data centers consume a staggering number of them. Not all of them make their way to the actual IT equipment that provides all this functionality. Often as any Watts are used to cool the equipment as are used to drive it. With electricity bills that would make some smaller countries quake, the data center owner/operator would obviously like to minimise cooling costs. Good news is that we  in the Mechanical Analysis Division of Mentor Graphics provide a great software solution to simulate, investigate and verify data center cooling options prior to committing to them in operation. FloVENT has a proven track record in data center application. Check out this on-demand video for an introduction about the value FloVENT can provide when applied to data center cooling.

If you don’t want to take my word for it try one of the search engines, how about Ask Jeeves?

10th august 2010 Ross-on-Wye

*** BREAKING NEWS: I have just found out that horses do indeed have frogs, though surely only the most fervent and uneducated of horsey people would want to know how many.***

data center cooling, data centre, Data Center, FloVENT, HVAC, data centre cooling, Electronics Cooling

More Blog Posts

About Robin Bornoff Follow on Twitter

Robin BornoffRobin Bornoff achieved a Mechanical Engineering Degree from Brunel University in 1992 followed by a PhD in 1995 for CFD research. He then joined Mentor Graphics Corporation, Mechanical Analysis Division (formerly Flomerics Ltd) as an application and support engineer, specializing in the application of CFD to electronics cooling and the design of the built environment. He is now the Product Marketing Manager responsible for the FloTHERM and FloVENT softwares. Visit Robin Bornoff's blog

More Posts by Robin Bornoff

Comments

No one has commented yet on this post. Be the first to comment below.

Add Your Comment

Please complete the following information to comment or sign in.

(Your email will not be published)

Archives

Tags

 
Online Chat