Mechanical Analysis Blog

Posts tagged with 'engineering change orders'

Avoid Late Stage Design Changes

Posted Jul 6, 2010, by Nazita Saye

Is common sense all that common? If it were, people wouldn’t cause gridlock (if you can’t clear the intersection, wait on your side of the intersection. Easy.).  If the red light is out, treat it as a stop sign – everyone gets a chance, traffic moves smoothly and everyone eventually crosses the intersection safely. Hmmm… can you tell traffic was especially nasty on the way to work today? Anyway, we’re … Read More

Tags: Physical Prototype, Integrated Device Technology, semiconductor packaging, design change, Design Process, cost, FloTHERM PACK, IDT, ECO, engineering change orders