Integrate Test Program Development with System Design
Technology Overview
Abstract
Traditional design methodologies have fairly strong boundaries between the different design phases, with particularly strong boundaries between the R&D world and the manufacturing & test world. These sequential processes lead to long development times. This presentation describes how you can leverage your test environment through the development process—without waiting for hardware, and extend your design environment with LabVIEW and other leading design tools.
Duration: 05:28
Related Resources
Multimedia
System Modeling, Simulation & Analysis - A methodology to develop a reliable system
Today’s cross-discipline systems require a highly coordinated development flow and design teams and tool environments must now interact in a multi-discipline, concurrent engineering design process...…View On-demand Web Seminar
Leveraging Your Test Environment without Waiting for Hardware
Creating a test program for your system is a challenging task with complex interactions that cross multiple design domains (electrical, mechanical, software, control, etc). This is even more difficult when...…View Technology Overview
A Cost Effective Hardware Option for SWaP and Obsolescence Challenges
Reducing size, weight and power (SWaP), improving reliability, and addressing parts obsolescence are increasing concerns in mil-aero hardware development projects. A Via Configurable ASICs (VCA) can be...…View Technology Overview
Other Related Resources
Linking Early Mechatronic System Analysis to Physical Testing
White Paper: This...…View White Paper
Modernizing System Development: Requirements-based, Model-driven Design, Implementation & Test
White Paper: This paper explores a more modern approach to system development built on a Model Driven Development (MDD) approach. MDD directly addresses the three key challenges of systems design: 1) sequential development...…View White Paper
Concept to X
White Paper: This...…View White Paper
