Sign In
Forgot Password?
Sign In | | Create Account

DO-254 Lifecycle

Requirements Capture

Requirements capture for DO-254 projects

Requirements management is vital to a successful DO-254 program. This phase captures requirements from the system to the component. It also includes requirements traceability, which ensures that there are links between requirements, the code that implements them, and the tests/results that demonstrate verification of the requirements.

Successful DO-254 requirements management with Mentor Graphics ReqTracer

Establishing a requirements-driven design flow and managing requirements as they evolve through a project can be difficult. Mentor Graphics ReqTracer can facilitate requirements management and traceability all the way through development and verification.

  • Provides requirements-oriented project management from concept through implementation.
  • Designed to support the traceability needs of DO-254 projects
  • Integrates with Mentor Graphics native environments for HDL development, verification and synthesis
  • Flexible; adapts to nearly any tool used in a DO-254 development process

Learn more about ReqTracer